[PageStream 2 document TOMJAN30.DOC: 8.50 x 11.00 in, 4 objects] --- Page 1 --- [1 drawing objects, see TOMJAN30.DOC.p001.svg] Weekly Report To: Tom Ulazsek From: Marty Pennock Subject: Status Report Date: January 30, 1992 Accomplishments 1. Defined all connectors and their proper part numbers for the Sparrow project. Turned list over to Zach Hyatt for specs. 2. Put together pin lists for all external connectors for the Sparrow project. 3. Drew external connectors for Sparrow. 4. Finished 80% layout of Sparrow Service Guide chapter 2. 5. Finished re-edit of Falcon chapter 1. 6. Started Falcon Chapter 2. 7. Finished external connector layout and pin info and Faxed to Richard. 8. Checked up on ABC386SX BOM. 9. Checked up on Sparrow mechanical drawings for Case Design. 10. Started internal connector specs and layout for Sparrow. 11. Cut out WD info from data sheets for ABC386SX Service Guide. Plans 1. Finish ABC386SX Service info and ship to Maria in SUVL. 2. Finish internal connector specs and fax to Richard. 3. Get Sparrow case drawings. 4. Finish layout of Sparrow Service Guide chapter 2. 5. Continue Sparrow Service Guide Chapter 3. 6. Get new DynaCADD software and continue to generate art for service guides. 7. Complete conversion of TT030 and MEGA STE Service guides. --- Page 2 --- 8. Check on MEGA STE Addendum. Find out if full addendum is necessary. 9. Finish Falcon Service Guide chapter 2. Problems 1. No new software yet received from Ditek (DynaCADD). Need it to complete projects. Have contacted Bill Rehbok and Richard Miller on problem. No results as yet. 2. No ASIC documentation for Falcon chips. Need them to continue work on the Service Guide. They have not yet been written. 3. Still cannot get full BOMs for ABC386SX from Doc Center. 4. MEGA STE addendum may be unnecessary due to the fact that the build is being phased out. Must determine if ant 2MB floppy units were built. Must also determine if only the ECO history is determined at this point. 5. Need diagnostic and start-up code for Sparrow to continue the Service Guide. 6. Need to develop a way to get specs on components and devices in a more timely manner. Current manner requires someone to sit in the Doc Center until it is pulled, or wait 1-2 weeks for info.