[PageStream 2 document TOMJAN9.DOC: 8.50 x 11.00 in, 6 objects] --- Page 1 --- [1 drawing objects, see TOMJAN9.DOC.p001.svg] Weekly Report To: Tom Ulazsek From: Marty Pennock Subject: Status Report Date: January 9, 1992 Accomplishments 1. Got extra separators from Suzanne for ATB books. 2. Contacted Bill Rehbok on problems with DynaCADD. 3. Got Falcon product spec. 4. Got phone number from David Viogts for Western Digital and ordered chip specs for the ABC386SX WD build service information. 5. Sent corrupted TT030 GEM files to Bill Rehbok for evaluation. 6. Contacted DynaCADD on problems with GEM files being imported to PageStream. 7. Sent DynaCADD distribution disks to DITEK (DynaCADD) for fix of GEM file creation problem. 8. Finished Falcon Service Manual Chapter 1. 9. Set up ATB tracking log. 10. Went through MEGA STE ECO history and pulled all missing ECO's. 11. Started Sparrow Service Guide. 12. Completed Chapter 1 of Sparrow Service Guide. 13. Generated FAX to Israel requesting latest schematic and product spec for the Sparrow project. 14. Got Sparrow schematic copy from Rick Holman. 15. Converted MEGA STE Addendum text to PageStream. 16. Finished making copies of ATBs that need to be sent. 17. Converted all ATBs to ASCII format for BBS. 18. Talked to Jerry Smith on progress of release of new MEGA STE schematic and BOM for Addendum. --- Page 2 --- 19. Assembled all ATB books to be shipped to subs. 20. Updated ATB shipping log. 21. Installed second 80MB disk in ABC386DXII system. 22. Finished Sparrow Service Guide Chapter 1. 23. Started Sparrow Service Guide Chapter 2. Plans 1. Finish ABC386SX WD version Service info. and ship to Maria Barboza. 2. Ship ATB books to subs. 3. Continue work on Sparrow Service Guide. 4. Continue work on Falcon Service Guide. 5. Continue conversion of TT030 and MEGA STE Service Guides to Pagestream. 6. Continue evaluation of boards in ABC386DXII system. 7. Update TT030 with fixed copy of DynaCADD. 8. Get case drawings for Sparrow and Falcon Manuals. 9. Finish MEGA STE Addendum and ship to field. 10. ECO TT030 change pages. 11. Continue ATB tracking and shipment. Problems 1. MEGA STE schematic and BOM for new version with AJAX and COMBO not done yet by Jerry Smith. Cannot complete MEGA STE addendum until these are completed. 2. Sparrow schematic changing too much to do a good service guide. Need to have time for spec to settle. 3. Do not have correct spec on Sparrow to use for Service Guide. 4. Do not have case drawings for Falcon or Sparrow. Cannot complete either Service Guide without them. 5. Need boxes for ATB books so they can be shipped. 6. Need new update of DynaCADD so I can complete TT030, MEGA STE, Falcon, and Sparrow Manuals. --- Page 3 --- 7. Need Western Digital Data Book to complete ABC386SX info package. 8. Need good ECO History to put together ECO for release of TT030 changed pages.